Jumbo 10m
With static for tall buildings
Tower with tilting base flanges on top a 20 mm
thick aluminum plate, adopted to an existing
U-beam on top of the University of Schweinfurt.
Tower system was assembled and installed on
location by Hummelmast Inc. in 5 hours.