Jumbo 10 m
4 pipes on tower head with system clamping holders
Slide resistant platform area on top off head
Safety ladder system
The towers were installed in Kassel for a DSL/W-Lan provider.
The adjacent pictures depict the first two segments.
The customer was instructed how to assemble the tower at our facility.
We installed the first two towers along side with the customer as training.
Additional towers were ordered, assembled and installed by the customer.